In just 12 months, Sage Geosystems and San Miguel Electric Cooperative built the world’s first pressure geothermal system. It is now poised to deliver long-duration, dispatchable storage for the Electric Reliability Council of Texas (ERCOT) as variable generation and data center demand surge.