• dylanmorgan@slrpnk.net
    link
    fedilink
    English
    arrow-up
    10
    ·
    6 hours ago

    Except there are zero contracts in place to actually build those data centers, nor is there enough power generated to run them. I really wish tech journalists would do the background to determine if what these documented liars are saying is even possible, never mind likely.