• rumba@lemmy.zip
    link
    fedilink
    English
    arrow-up
    2
    ·
    20 hours ago

    I’m certain they make them get signoff from neighbors, do an architectural application, and have it reviewed.

    The minimum they’re likely to be able to get away with is repaving in whole or part and about 6 months to get the authorization.